The new Forth road crossing
The geological conditions on the river bed made it difficult to seat the caissons used for casting the foundations, so grout curtains were constructed and lateral deflections were monitored using SAAs during construction of the concrete footings.
The 7m long SAAs were installed though 40m long conduits. Vertical displacements of the caissons were measured using vibrating wire crack gauges.